Set up.

The 24 lights are being installed as we speak. I stopped by today to drop off the tea light canopies and see how it was all coming along.

 

Here is one of the PINATA's installed. There was a lot of construction still underway so I couldn't spend a lot of time snapping pictures. Check back soon for more images.

Below are a few of the tea light canopies--25 will light the tables and bar.